Insidecostarica.com   Costa Rica Classifieds   Costa Rica Real Estate Guide   Aventuras Costa Rica   iStarmedia

latinfriendfinder

              

                    

 Home  |  Email  |  About Us

Insidecostarica.com - San José, Costa Rica  -    Thursday 07 June 2007

Report a pothole!

NEWS
Costa Rica
Latin America
International

SECTIONS
Real Estate
Travel & Tourism
Classifieds
Business
Health & Well Being
The Internet
Special Reports

EDITORIAL
& OPINION
Letters
Columnists
Editorial

 
Visit our store for
books and DVD's
on Costa Rica!

Libya, Nicaragua Talk Cooperation
Panama Canal expansion to begin August
El Salvador on Eve of Crisis
Guatemala Opens International Industrial Fair
Fidel Castro Warns of World Problems
Colombian, Venezuelan FMs meet over drug spat
 



Where service makes the difference
Avanti Limousine Services



Panama Canal expansion to begin August
BALBOA, Panama (Reuters) - The first stage of a us$5.25 billion expansion of the Panama Canal should begin ahead of schedule by the end of August, a top canal official said on Wednesday.

Dredging works at the southern mouth of the canal on the Pacific will start in August instead of October as previously announced, Panama Canal Authority deputy administrator Jose Barrios said.

The first onshore excavation works are scheduled to begin before the end of calendar 2007, Barrios told Reuters in an interview.

Panama is aiming to build a third lane of locks to increase the canal's capacity and allow larger ships to travel between the Pacific and Caribbean.

It hopes to have the third lane operational in time for the canal's centennial in 2014.

The bidding specifications for the dredging would be ready next month, slightly late, Barrios said, but the bidding process would be short.

"Even if we don't get (the specifications) on time we are going to get ahead of schedule," he said.

 He said bidding terms for the excavation work had been published and that more firms than expected had expressed an interest in the tender.

The excavation project involves removing 8 million cubic meters of soil and rock where a the new lane will skirt around the current Miraflores and Pedro Miguel locks at 24 meters above sea level.

That work will begin after Panama's fiscal new year in October.

Barrios forecast strong growth in the canal's cargo tonnage, but smaller growth in the number of ships passing through.

For fiscal 2007, Barrios estimated the waterway would carry 320 million tonnes of cargo, an increase of 10.3 percent from earlier estimates.

Northbound container traffic from Asia is seen as the main thrust behind the rise in tonnage, although an increase in southbound grain cargo has also been noticed, Barrios said.

For fiscal 2008, he said the canal's "conservative" projection is for cargo flows to increase 6 million tonnes or 1.9 percent
 


 



 

 
   

Home | Weather | Classifieds | Travel & Tourism | Real Estate | Business | Health | The Internet | Special Reports | Archives | Search
Letters | Editorial |  Columnists EroTica | Learn Spanish | Photo Gallery Online Shop | About Us | Contact Us | Advertise with us | Links
©2002-2005 Insidecostarica.com. All rights reserved. Privacy Policy | Terms of Service | Subscribe to our Newsletter
Website Design,  Hosting & Maintenance by: iStarmedia Internet Solutions

This site best viewed at 1024 x 768 pixel resolution or greater with the latest major browsers.