Thursday 05 June 2008, San José, Costa Rica

/ COSTA RICA

Send this page to a friend

 HOME PAGE  •  ADVERTISE WITH US  •  SUBSCRIBE TO OUR NEWSLETTER

   | SEARCH • ARCHIVES 


Another Gasoline Price Hike Approved, More On the Way
At Least A Month Before Interamericana Sur Will Be Completely Opened
Supermarket Chain Eliminates Sales Tax In Latest Promotion
Spectacular Train And Bus Crash Resulted Only In Minor Injuries
INS Premiums Can Now Be Paid Online
Elephant Beetle In Quest For Mate

At Least A Month Before Interamericana Sur Will Be Completely Opened
Alma continues to affect residents and visitors of the Southern Zone as work to repair the Interamericana Sur, the main route to and from San José to major centres like Pérez Zeldrón and the Panaman border, continues at a slow pace.

The Ministerio de Obras Públicas y Transportes (MOPT) has to deal with some 34 landslides that occurred last week in the stretch of highway between kilometre 101 and 120, in the area known as Cerro de la Muerte, near Pérez Zeledón.

Some minor problems are also being reported between kilometres 60 and 98.

Most of the landslides are being cleaned up, but making the situation worse is some 300 to 500 metres of road at kiloemetre 114 that was completely washed away and will require a bridge to be constructed. The MOPT is evaluating the construction of a Bailey bridge.

For the meantime, MOPT machinery is filling the washed away part of the road and installing pipes to drain the water. However, it will be days before the earth can be compacted and depending on the climate conditions of the coming days, before a determination can be made if the road can be reopened at that point.

Initially the MOPT has said that the highway would be re-opening by the end of the week (tomorrow, Friday), however, that is now an impossibility and MOPT officials are saying now that it will be at least another week.

Traffic to and from the Southern Zone is being rerouted through the only other route, the Costanera, from Jacó to Quepos to Dominical.

The trip from San José to Pérez Zeledón is eight hours at least, more if conditions at the Parrita bridge don't improve, as well as problems on the 20 kilometre stretch between Quepos and Dominical, that takes up to two hours in best conditions.

According to Karal González, MOPT minister, engineers are evaluating which areas need shoring up and reinforcements before the road can be opened again.

Minister González said that it will be least a month before the Interamericana Sur will be back to normal.
 
 


Click here for a map of the affected area provided by La Nación.

 

 

 
 

Advertise With Us | Subscribe To Our Newsletter | Archives | Search | About Us Online Shop | Learn Spanish | Photo Gallery |  Links
2133-1000 San José, Costa Rica  E-Mail: [email protected]  Telephone: (506) 8845 5800  / (506) 2231 3205  Fax: (506) 2232 6337
©2008  INSIDECOSTARICA.COM  All rights reserved.
Privacy Policy For more information on this website contact: [email protected]
Website Design, Hosting & Maintenance by: iStarmedia Internet Solutions