|
Electric Power Rationing
Continues
Even though the Instituto
Costarricense de Electricidad
(ICE) was able to restore
operations at the Moín (Limón)
and San Antonio de Belen power
stations, rotating electric
power cuts will continue through
the weekend.
The third plant located in
Barranca, Puntarenas, is still
out of order and will be the
reason for power cuts if the
plant doesn't go online soon,
according to ICE spokesperson,
Geovanni Bonilla.
The rotating power cuts will be
all over the country. Since
Thursday, ICE has been shutting
down power to all localities,
for between two and three hours
at a time. Costa Rican can
expect that when the lights go
out, it will come back in 2
hours, said Bonilla.
And the cut in electrical power
supply has mean water cuts as
well, as the pumps working on
electricity stop when the power
is cut in the affected area,
cutting water to large areas.
In San José the rotating power
cuts have caused traffic
congestion in many major
intersections as traffic lights
stop working, some becoming
damaged and needing repair,
spreading thin the resources of
the Ministerio de Obras Públicas
y Tranpsortes (MOPT).
On the good side, the Policía de
Tránsito (traffic police) report
less traffic accidents and the
few accidents that have occurred
have been fender benders mainly.
One Tránsito official the
popular radio station, Radio
Puntarenas, said that it seems
the conscious of Ticos has been
raised as they are seeing more
defensive driving and more
courtesy on the roads since
Thursday and that the worries of
the Policía de Tránsito
director, who feared total
chaos, never realized.
"During the weekend the power
cuts will continue and there is
no clear answer as to when it
will end", said Bonilla, who
added that there is hope that
the technical problems will be
resolved by today.
ICE has ordered that the power
utilities, like the Compañía
Nacional de Fuerza y Luz, that
distribute the electrical power
to residents and businesses have
ready an extended plan of
rationing and that power outages
cannot be longer than three
hours in each sector, as it
prepares in the event that the
rationing will continue into the
end of next week.
|
|

Some believe that the unions are
behind the power cuts in an
effort to pressure the
government in investing more in
infrastructure. |
|
|
|
|
|