Subscribe via E-Mail

Get all of our news delivered fresh to your inbox every morning! Just tell us your name and where to send it using the form below.

PS – We hate spam too. We don’t sell or share our list with anyone, and we never send commercial email.




luxe
Friday, January 29th, 2016  |  USD: Buy 531.29 / Sell 543.92
20 years

Spain’s Gamesa and Iberdrola to build 4 wind farms in Costa Rica

tilaran wind farm

A wind farm in Tilaran. (Archive image).

MADRID, December 30th, 2015 (EFE).- Spain’s Gamesa, a manufacturer of wind turbines, said it and Iberdrola Ingenieria signed a contract to build four wind farms with 80 MW of generating capacity in Costa Rica.

The contract signed with Globeleq Mesoamerica Energy, or GME, covers construction and implementation of the Alisios project, which has four wind farms in northwestern Costa Rica with 20 MW of generating capacity each, Gamesa said in a statement.

The Vientos de La Perla and Vientos de Miramar wind farms, located in the city of Liberia, and the Altamira and Campos Azules wind farms, which are in the city of Tilaran, will employ about 400 people during the construction phase.

The wind turbines will be delivered in the second half of 2016 and the facilities should go online toward the end of the year, Gamesa said.

Iberdrola will handle the engineering, supply and construction work, Gamesa said.

Gamesa, which operates around the world, is developing projects in the United States, Mexico, Brazil and the Dominican Republic, among other countries.

Iberdrola is a leading global energy company and the largest electric utility in Spain by market capitalization.

costa rica news

ATTENTION: If you are seeing this message,


Advertisement


Get our news delivered fresh to your inbox every morning.

Click here to subscribe to our email list. We hate spam too and never send commercial email.

Like us on Facebook and receive our news in your timeline

  • gc

    same company built in Nicaragua. as i watched the assembly and operation the people that own the land became lottery winners and in high winds they blow over. now i am sure more happens than that but relying on info on the news here is like relying on some old hippie that never outgrew their mentality. so i can only say what i know, they pay big rent and they do fall over. boy o boy, they are big too. pieces fall off all the time.

    • SDPUS

      Still a much better alternative than the overall pollution caused by fossil fuels. Not to mention, the problems you point out with “lottery winners” takes place with the development of any energy system. That is more of a political problem, than scientific. There are ways to alleviate that crony corruption as well, but under the crony capitalist system that the world now operates under, I doubt it will happen anytime soon. I think in an article like this, it is better to site the good impacts, rather than accentuate the bad. The future can’t keep listening to the same old neo-conservative gripes of clean energy.

      • gc

        “Still a much better alternative than the overall pollution caused by fossil fuels. ”

        not for the people that pay for these schemes. fossil fuel use is cleaner and more effricient every year. government will never be able to make that claim

Popular Content