Friday 11 July 2008, San José, Costa Rica

/ COSTA RICA

Send this page to a friend

 HOME PAGE  •  ADVERTISE WITH US  •  SUBSCRIBE TO OUR NEWSLETTER

   | SEARCH • ARCHIVES 


Confusion And Doubt Reigned On First Day Of Expanded Vehicular Restrictions
Drivers in Costa Rica Should Consider Themselves Lucky When It Comes To Gasoline Prices
Some 2 Tons Of Cocaine Floating At Sea in Puntarenas
Bike Trail Network To Be Built In Guanacaste
Legislators Review Bill To Upgrade, Build National Airports

Bike Trail Network To Be Built In Guanacaste
(Guanacaste Journal - Infocom)  The Ministry of Transportation and Public Infrastructure (MOPT) is seeking to build several bicycle trails in the province of Guanacaste, now that the Comptroller General has given permission to go ahead with this project.

An obstacle standing in the way, however, is the lack of funds budgeted for the initiative. The Inter-American Development Bank (IDB) has donated us$1 million, but such amount is insufficient and more funds are needed to begin the works.

The IDB funds would only allow the construction of 10 kilometers of bike trail. A total of us$8 million are needed to carry out the project in Guanacaste as well as similar works in Guapiles (Caribbean) and Esparza (Central Pacific). The project is also expected to receive $1 million from the World Bank.

One of the bike trail routes would go from Liberia to Cañas, for 47 kilometers. The other trail would be built between 27 de Abril and Rio Seco in Santa Cruz (next to the proposed highway between these two communities), and the last between the beaches of Junquillal and Avellanas.

The project entails construction of the bike trails, sidewalks, railings and pedestrian bridges.

Regarding additional sources of financing, a request for funds has been submitted to the International Automobile Federation (FIA), based in London. The National Roads Council (CONAVI) would also help finance the project.

Bike trails are being billed as an alternative to the increasing cost of fuel. However, cyclists’ safety must be guaranteed avoiding circulation in areas of high traffic. That’s why one of the main goals of the bike trails is ensure cyclists will be able to ride free of risks. The problem is that each kilometer of safe and adequate bike trails costs $100,000, leading to the need to find several funding sources to make this project a reality.

It is estimated that once the design of the bike trails is ready, their construction would take approximately three months. The goal is to build 167 kilometers of bike trails around the country. The only existing bike trail is the one from Barranca to Caldera in the Central Pacific, near the port city of Puntarenas.

The IDB’s donation is part of a larger project to improve public transportation and construction of bike trails in cities such as Curitiba (Brazil), Lima (Peru) and Montevideo (Uruguay).

Meanwhile, the World Bank has shown interest in promoting the use of bicycles in Latin America, in places such as Santiago de Chile.
 
 
 

 

 

 
 

Advertise With Us | Subscribe To Our Newsletter | Archives | Search | About Us Online Shop | Learn Spanish | Photo Gallery |  Links
2133-1000 San José, Costa Rica  E-Mail: [email protected]  Telephone: (506) 8845 5800  / (506) 2231 3205  Fax: (506) 2232 6337
©2008  INSIDECOSTARICA.COM  All rights reserved.
Privacy Policy For more information on this website contact: [email protected]
Website Design, Hosting & Maintenance by: iStarmedia Internet Solutions