Sunday 19 July 2009, San José, Costa Rica     • Yesterday's Edition //Home Page • Photo Journal • Contact Us • Archives • Site Search • Subscribe To Our Newsletter • Compare Us!
• Honduras Peace Talks in Costa Rica To Continue Today As Both Sides Reject Arias Proposal
• Traffic in La Uruca and Santa Ana A Complete Mess On Saturday
• Five Hospital Doctors in Costa Rica With AH1N1
• Ticos Forego Luxuries Like McDonalds As They Weather The Economic Crunch
• Guanacaste Continues To Be Favorite Destination For Mid-Year Vacations
 


 
Traffic in La Uruca and Santa Ana A Complete Mess On Saturday

The closure of the autopista General Cañas from the Juan Pablo II bridge in La Uruca to the Virilla bridge on the San Jose - Alajuela direction, caused a nightmare for drivers, adding up to 120 minutes of travel time what normally takes less than 5 minutes on the autopista.

Traffic at the Juan Pablo II bridge was detoured onto La Uruca on the road to Heredia, through La Lagunilla and back on the autopista by the Plaza Cariari.

Traffic backed up all the way to the Sabana park.

Many drivers decided to avoid La Uruca completley and opted for the round about of Santa Ana to San Antonio de Belen.

All was well until past the Guachipelin exit when traffic bottlenecked all the way past Lindora and just past the Texaco station.

A normal trip from Multiplaza to the Marriot San Jose takes, during normal traffic congestion, not more than 20 minutes. Yesterday, it took more than an hour in the morning and 90 minutes in the afternoon.

What made it all worse are the big rigs that were forced onto the alternate roads and having to negotiate narrow roads and turns, made worse by the traffic congestion.

At the Texaco station in Santa Ana, heavy trucks used the centre lane used for left turns, as their own private lanes, causing even more bottlenecks as the road converged to two lanes before crossing into Belen.

The director of Tránsito, Germán Marín, said that his officers did their best to keep traffic moving.

The General Cañas between the Juan Pablo II and Virilla bridges was converted into a long playground as youths used the unused road for skateboarding and riding bicycles.

The same is expected today and until 6am Monday when the autopista re-opens.

The closure of the General Cañas is to allow work crews to repair two key bridges on the all important highway, as the bridges are suffering from wear and tear and the lack of preventive maintenance.

The Virilla bridge has had its holes patched with metal plates. The weekend work will include pouring concrete to firm up the structure. At the Juan Pablo, the work includes repairing a huge hole that formed on the right lane.



 
 

 
 


 

 

2002 - 2009  INSIDECOSTARICA.COM   2133-1000 San José, Costa Rica  -  Subscribe to our newsletter!
E-Mail: [email protected]  Telephone: (506) 8845 5800  / (506) 2231 3205  Fax: (506) 2232 6337