Tuesday 10 November 2009
Home Page    |   Contact Us
Search Insidecostarica.com

 
 

PHOTO JOURNAL | CLASSIFIEDS | Subscribe To Our NEWSLETTER! |  Follow Us on Twitter | Find True Love in Costa Rica! 

 
 
COSTA RICA
 

Bridge Over River Tárcoles Finally Under Construction

It took the death of five people and dozens injured for the Ministerio de Obras Públicas y Transportes (MOPT) to take action to replace the suspension bridge over the Tárcoles river between Turrubares and Orotina.

The collapse of the bridge on October 22 when a loaded passenger bus plunged into the river below brought to light the poor condition of some 1.000 bridges, 10 of which are classed as "critical", across the country.

The irony in the October 22 accident is that it could have been prevented if the MOPT has acted responsibly and not marred down in red tape, as it had the material to replace the bridge in storage for some years.

Following the tragedy of over two weeks ago, the MOPT has begun erecting the metal structure bridge that should have been built almost a decade ago, as the fallen bridge, built more than 40 years ago, has been lacking maintenance for at least two decades.

The new structure spans about 80 metres across the river.

Meanwhile area residents continue to use boats to cross the river to move from one side of the river to the other. The MOPT says the Bailey type structure will be ready by Thursday.
 
 


 
 

 

 


 
 
 
 

E-Mail: [email protected]  2002-2009 © Insidecostarica.com. All Rights Reserved